Hello.. In the reinforced concrete structure that I designed with 4-storey hollow slab, the periods are long and the torsion mode appears in the 1st mode. Although there is no problem in the reports, would it be correct to allow the periods to be as long as 1.15 seconds in a 4-storey structure and the 1st mode to be torsion?
You do not have permission to view link
Log in or register now.