steel project

mehmet ergin

New Member
The slenderness ratios in the upper and lower heads of the scissors.... İzmir YTE R&D The same scissors with MKA Software save with 2L 70/7 Section It does not give slenderness ratio error on printouts. I can't remove the slenderness error when I solve it with ide. You have to enlarge the section. MKA stated that the slenderness ratio should be different for multi-storey buildings. ALSO, AKHİSAR MUNICIPALITY DID NOT ACCEPT THE PROJECT BECAUSE THERE ARE NO COMBINATION AND RESOURCE ACCOUNTS IN SHEAR ACCOUNTS. waiting for your help. But this job went to another office just for this reason.. best regards..
 
Hello there; 1- We don't know what and how you ask the engineers in MKA software, but the slenderness control has absolutely nothing to do with whether the structure is low or multi-storey. This control is done for the elements working on axial load and the solution is quite simple. It is sufficient to connect your truss sub-heads to each other from the middle node with a stability beam. You will see in the attached project that 2*L70*7 is sufficient in this case. If you want a reference on the subject, you can find the use of stability beams in the 2007 earthquake code sample book. Similarly
You do not have permission to view link Log in or register now.
You can use the video in the link. If you wish, Doc. Dr. You can also request information from Cüneyt Vatansever. 2- In the promotions and brochures about the program, on the website and in the presentations, it is specifically stated that the steel joints are divided into 2, that one group is designed with both the Earthquake regulation and the Turkish and American steel regulations, and the other group is only for drawings and is constructive. In the program interface, you can see that these two groups are separated. If you have overlooked all these, our technical support is free as you know, if you are producing the steel project for the first time with ideCAD, you could get technical support without delivering the project. If you think that there is a problem in the project until you get used to the program, you should definitely contact technical support. All necessary information will be given clearly.
 
Back
Top