Rib Direction

damlatpz

New Member
Good morning, first of all good work everyone. I encountered an error as a result of the building inspection inspection of a reinforced concrete project I prepared. I would like to get your opinion. I received a warning saying "Vertical threads are to be placed in hollow floors in places exceeding 4m". I interpreted it as perpendicular to the beam with the large span, but I'm not sure. I would be very happy if you are interested, good work.
 
"damlatpz":uaq7lr29" said:
Good morning, first of all good work to everyone. I came across an error as a result of the building inspection inspection of a reinforced concrete project I prepared. I would like to get your opinion. I received a warning saying "Vertical threads should be placed in hollow slabs in places exceeding 4m". I interpreted it as perpendicular rib to the beam with more span, but I'm not sure. If you're interested, I would greatly appreciate it. Good work.
Hi, Follow the information below. Good work
You do not have permission to view link Log in or register now.
 
Back
Top