CONTINUOUS FOUNDATION AND BEAM CONTINUITY

serhatctin

New Member
I WILL TALK ABOUT A DEFICIENCY IN THIS PROJECT ENTERED IN THE MUNICIPALITY. ESPECIALLY HOLLOW FLOORING IN THIS QUESTION by experience I EK THE FILE K22 and K23 BEAM for BEAM EXPANSION in CONTINUOUSLY CAPTURING hereinafter A PROBLEM NO BUT K24 BEAM Can not CONTINUOUS RATES THIS BEAM GOING FOR A BEAM END POINTS WITH OTHER BEAM STARTING POINT THE SAME SHOULD BE THAT RIGHT UCTE CONTINUOUS Allow RATES BUT HOLLOW BEAM in FLOORING WHEN I WANT TO OPERATE ON THE SAME POINT, THE STARTING POINTS OF THE K24 AND K23 BEAMS ARE THE SAME AS AN EXAMPLE AND THESE TWO BEAMS ARE NOT CONTINUOUS. I DIDN'T OVERCOME THIS PROBLEM AT THE ANGLE OF GENERAL REINFORCED CONCRETE PARAMETERS, AT 30 DEGREES, REQUIRED FOR THE ACCEPTANCE OF CONTINUITY. I NEED HELP WITH THIS MATTER, I WISH EVERYONE GOOD WORK...
 